An official website of the United States government
Here’s how you know
Official websites use .gov
A .gov website belongs to an official government organization in the United States.
Secure .gov websites use HTTPS
A lock
( )
or https:// means you’ve safely connected to the .gov website. Share sensitive information only on official, secure websites.
The Calexico West Land Port of Entry is the main border crossing linking the important Imperial Valley agricultural industry to the State of Baja California. Built in 1974, the port’s pedestrian and vehicle inspection facility could no longer accommodate current traffic loads or meet the U.S. Customs and Border Protection’s security requirements. Since 2015, the U.S. General Services Administration has led a modernization and expansion project to replace obsolete 1970s buildings with new expanded vehicle and pedestrian inspection facilities that enhance CBP’s ability to accomplish its mission.
Phase 1, completed in Fall 2018, consisted of three southbound privately owned vehicle lanes and a southbound bridge over the New River, ten northbound privately owned vehicle inspections lanes with primary and secondary inspection canopies to include booths and inspection equipment, a new operations building, and sitework to accommodate those facilities on the sloping site. In fiscal year 2019, GSA received $191 million to fund Phase 2A of the project, which included a new administration building, expansion of the vehicle secondary canopy inspection areas from nine to 16 and new northbound vehicle lanes from 10 to 16; five new southbound vehicle lanes, inspection booths, and canopy area; and secure employee parking. Phase 2A was completed in Spring 2024.
In 2021, GSA received funding for Phase 2B through the Bipartisan Infrastructure Law; to complete the project. Specifically, the BIL-funded portion includes the installation of a temporary pedestrian inspection facility. This will accommodate the demolition of the existing pedestrian building and construct an expanded, permanent pedestrian inspection facility with increased processing capacity. Once complete, the project will provide the port with adequate operational space, reduced traffic congestion, and a safe environment for port employees and visitors alike.
Budget: Project design and land acquisition: $24 million Phase 1: $98 million Phase 2A: $191 million Phase 2B: $85–$105 million (estimated BIL funding)
GSA completed its programmatic environmental impact statement process in Fall 2022, which evaluated the potential impact of Phase 2B work as part of the port’s modernization and expansion project. GSA held a series of public meetings to gather input from the local community and key stakeholders.
A design build scoping contract, which will be used to develop the project’s design-build solicitation package, was awarded in March 2023. Award of a Design Build contract occured July 2024.
Environmental review
Temporary pedestrian processing facility
GSA completed an environmental assessment to review the potential impacts of constructing a temporary pedestrian processing facility and alternatives at the Calexico West Land Port of Entry. These NEPA documents are available for review.
Modernization and expansion project
The final environmental impact statement for the modernization and expansion project was published May 2011 and the record of decision was published July 21, 2011. The EIS documents are available for review. The appendix documents can be found in the national NEPA Library.
Local updates
Apr. 9, 2024 GSA officials briefed community stakeholders and civic leaders on the port modernization and expansion project. The slides [PDF - 1 MB] are available for review.
Traffic advisories
There are no traffic advisories currently in place.
We received $3.4 billion to invest in our nation’s infrastructure and competitiveness. The law provides funding for LPOE modernization projects that will create new good-paying jobs, bolster safety and security, and make our economy more resilient to supply chain challenges — all while serving as models for sustainability and innovation.
Visit the California LPOE page for an overview of BIL projects there, as well as priorities, benefits and further information.
Sustainability opportunities
As a Design Excellence project, GSA is incorporating sustainable features aimed to minimize the port’s overall environmental impact with energy savings of 25 percent. The project was designed in 2007 to meet the United States Green Building Council Leadership in Energy and Environmental Design criteria for a LEED Silver rating, and the final design strives to attain LEED Gold rating.
Community impact
The Calexico West modernization and expansion will greatly enhance the traveling public’s experience by significantly increasing CBP’s pedestrian and vehicle inspection capacity and reducing border crossing wait times.
Phase 2B will double the number of pedestrian inspection booths from six to 12, inside a new, state-of-the-art 39,000 square foot pedestrian inspection building.
PER DIEM LOOK-UP
1
Choose a location
Error, The Per Diem API is not responding. Please try again later.
No results could be found for the location you've entered.
Get my location
OR
OR
Rates for Alaska, Hawaii, and U.S. territories and possessions are set by the Department of Defense.
Traveler reimbursement is based on the location of the work activities and not the accommodations,
unless lodging is not available at the work activity, then the agency may authorize the rate where
lodging is obtained.
Unless otherwise specified, the per diem locality is defined as "all locations within, or entirely
surrounded by, the corporate limits of the key city, including independent entities located within
those boundaries."
Per diem localities with county definitions shall include"all locations within, or entirely
surrounded by, the corporate limits of the key city as well as the boundaries of the listed counties,
including independent entities located within the boundaries of the key city and the listed counties
(unless otherwise listed separately)."
When a military installation or Government - related facility(whether or not specifically named) is
located partially within more than one city or county boundary, the applicable per diem rate for the
entire installation or facility is the higher of the rates which apply to the cities and / or counties,
even though part(s) of such activities may be located outside the defined per diem locality.