Photovoltaic Guidance
In 2013, GSA assessed 63 of its on-site photovoltaic (PV) solar projects and produced a robust resource titled On-Site PV Guidance. GSA concluded that the most successful projects established an integrated project team at the outset, enabling early discovery of potential challenges and allowing for modifications in design and scheduling to be made at minimum cost to the project.
Reference above to any specific commercial product, process or service does not constitute or imply its endorsement, recommendation or favoring by the United States Government or any agency thereof.
Additional resources
- Guidance: On-Site Commercial Solar PV Decision Guide (DOE, 09-2015)
- Guidance: Guide to Developing Renewable Energy Projects Larger than 10MWs at Federal Facilities (FEMP, DOE, 03-2013)
- Tool: Solar PV Project Cost Calculator (Optony, EPA, Draft 10-2013)
- Guidance: Guide to Integrating Renewable Energy in Federal Construction (FEMP, DOE, 08-2012)
- Guidance: Procuring Solar Energy: A Guide for Federal Facility Decision Makers (DOE, NREL, 09-2010)
- Tool: Database of State Incentives for Renewables & Efficiency (NC Clean Energy Technology Center, NC State University, DOE, undated)
- Tool: System Advisor Model for Grid-Connected Renewable Projects (NREL, 04-2010)