Additional Resources
An official website of the United States government
Here’s how you know
Official websites use .gov
A .gov website belongs to an official government organization in the United States.
Secure .gov websites use HTTPS
A lock
( )
or https:// means you’ve safely connected to the .gov website. Share sensitive information only on official, secure websites.
Federal Center South Building, 1202 Redevelopment
U.S. Army Corps of Engineers Headquarters, Seattle District, Washington
The U.S. General Services Administration (GSA) invested $72 million in American Recovery and Reinvestment Act (ARRA) funding to develop a state-of-the-art office building that meets the current and future needs of the Army Corps and its Seattle workforce.
The GSA received authorization to redevelop/modernize the 1202 warehouse building at Federal Center South into a high performing green office building for the Seattle Office of the US Army Corps of Engineers (USACE) in March 2009.
The 1202 warehouse building was constructed in the early 1940s by the US Army. It has subsequently been owned by the Boeing Company and the GSA. The building was a timber-framed single story warehouse with exterior concrete walls. It was a rectangular plan enclosing approximately 350,000 square feet. The building was supported on shallow timber piles.
The project is a redevelopment/modernization of the existing 1202 warehouse located at Federal Center South. The building is approximately 330 feet wide by 1100 feet long and is immediately to the west of the historic Albert Kahn-designed Ford Motor Company Assembly Plant (Building 1201) completed in 1932, at 4735 East Marginal Way Seattle, WA.
The project site encompasses approximately 50% of the footprint of the old building. The 1202 building has been determined to not be historic. This project provides for the future space requirements of the USACE and is the pivotal undertaking for a campus-like site redevelopment that can accommodate the 30-year expansion requirements for a number of other Federal Agencies. This project will help to revitalize the neighborhood and will receive an architectural treatment that is responsive to its context and due to its adjacency to the historic 1201 building.
This redevelopment of the 1202 Warehouse was accomplished through a strategy of structure and materials reuse to greatest practicable extent, introduction of modern building systems and use of innovative technologies to meet HPGB strategies. The work also included seismic upgrades, replacement of the existing foundation pile system, stabilization of liquefiable soils and any associated site development.
Pursuing aggressive energy performance targets, the new building is anticipated to be one of the most sustainable office buildings in the nation. The building is on track to earn an ENERGY STAR Score of 100 – putting it in the top 1 percent of comparable buildings.
In addition to the green features, the building has a unique design suited to the Army Corps of Engineers mission of “build strong.” The U-shaped floor plan is representative of the original course of the Duwamish waterway and maximizes daylight and flexibility. The building faces the water to reflect the Army Corps of Engineers work with our nation’s waterways.
A Design Build Contract was awarded to Sellen Construction on March 26, 2010. Sellen Construction teamed up with ZGF Architects as the lead designer. Abatement and demolition started in July 2010. The project was completed in October 2012.
For more information, contact:
Public Affairs Officer
Christi Chidester Votisek
253-931-7127
415-816-8512
christina.chidester@gsa.gov
Didn’t find what you need? Contact USA.gov.
National Building Institute Sustainable Building Council’s, First Place Honor Award
AIA Committee on the Environment, Top Ten Green Building Award
Associated General Contractors Awards & Recognition Programs
Error, The Per Diem API is not responding. Please try again later.
No results could be found for the location you've entered.
Rates for Alaska, Hawaii, and U.S. territories and possessions are set by the Department of Defense.
Rates for foreign countries are set by the Department of State.
Rates are available between 10/1/2022 and 09/30/2025.
The End Date of your trip can not occur before the Start Date.
Traveler reimbursement is based on the location of the work activities and not the accommodations, unless lodging is not available at the work activity, then the agency may authorize the rate where lodging is obtained.
Unless otherwise specified, the per diem locality is defined as "all locations within, or entirely surrounded by, the corporate limits of the key city, including independent entities located within those boundaries."
Per diem localities with county definitions shall include"all locations within, or entirely surrounded by, the corporate limits of the key city as well as the boundaries of the listed counties, including independent entities located within the boundaries of the key city and the listed counties (unless otherwise listed separately)."
When a military installation or Government - related facility(whether or not specifically named) is located partially within more than one city or county boundary, the applicable per diem rate for the entire installation or facility is the higher of the rates which apply to the cities and / or counties, even though part(s) of such activities may be located outside the defined per diem locality.