Use our Overtime Utilities services program [PDF - 489 KB] to request and pay for support/services outside of GSA’s 10-hour daily operations via a Reimbursable Work Authorization (RWA). Any service/labor outside of the daily operations is paid for by the tenant.
Use the external RWA Entry and Tracking Application (eRETA) customer portal to prepare and track overtime estimates. Check our RWA Policy and Guidance.
OU services and collections are authorized by the Federal Property and Administrative Services Act of 1949, (as amended, etc. by P.L. 107-217 [PDF - 3 MB] (Title, 40 U.S.C., Subtitle I)).
Guidance and reference materials
Policy reference
Sub-metering reference materials
Use sub-metering to reduce energy in buildings; sub-metering provides information at a local level, enabling building occupants and tenant agencies to identify energy intense systems and adjust their behaviors to achieve energy performance goals. For more information, view our sub-metering slide deck [PDF - 4 MB].
Power Metering Plans to Calculate Power Utilization Effectiveness
The following provide a conceptual measurement plan to facilitate real time calculation of Power Utilization Effectiveness and can be used to arrange for specifying, bidding and installing the meters:
Resources