The project scope includes the modernization of the land port to meet the program of requirements of space and facilities in support of Custom and Border Protections agency missions at the international border between Richford, Vermont and Abercorn, Quebec. The current facility no longer meets the CBP’s current LPOE design standards. The project will help improve traffic flow, enhance security, and facilitate trade and travel in the region. The project will include the use of low embodied carbon material and will be designed as a fully electric facility and be net zero ready. Interior upgrades will include an officer work area, secure hold and inspection area, and upgraded mechanical, electrical and plumbing utilities. Exterior upgrades will include traffic lane improvements, mechanical gates and guardrails as well as bullet rated officer inspection booths. These upgrades will increase officer safety as well as increase the efficiency of inspections of commercial and noncommercial traffic.
The pre-design services contract was awarded to Smith-Miller & Hawkinson Architects in July 2023. An award for the concept design, design development, and construction document contract is scheduled for 2024. The National Environmental Policy Act (NEPA) process is underway with completion expected in 2025.
Environmental review
The NEPA process was initiated in September 2024 with a public scoping meeting held in Richford, VT. Links to the scoping meeting materials are provided below. GSA is preparing an Environmental Assessment (EA) to evaluate the potential impacts of the proposed Richford LPOE project on the natural and human environment. The Draft EA is planned for release in early 2025. During the Draft EA public comment period, GSA will host another meeting to solicit feedback on the proposed project and its potential impacts.
Next solicitation opportunity is expected Fall 2025.
Bipartisan Infrastructure Law
We received $3.4 billion to invest in our nation’s infrastructure and competitiveness. The law provides funding for LPOE modernization projects that will create new good-paying jobs, bolster safety and security, and make our economy more resilient to supply chain challenges — all while serving as models for sustainability and innovation.
Visit the Vermont LPOE page for an overview of BIL projects there, as well as priorities, benefits and further information.
Sustainability opportunities
We will increase energy and water efficiency (including renewable energy and fossil fuel free measures), adhere to sustainable design principles, and minimize climate risk liabilities above the minimum performance criteria in a manner that is life cycle cost-effective.
Net-zero ready
80% fossil fuel-energy generated reduction
Green Proving Ground technology
LEED Gold/SITES Silver
Whole-building embodied carbon reduction
Community impact
This project will improve conditions for economic, cultural and familial connections. The people who live along the border depend on this deep, cross-border community engagement, often crossing through the ports daily for jobs, mutual aid, and everyday life.
PER DIEM LOOK-UP
1
Choose a location
Error, The Per Diem API is not responding. Please try again later.
No results could be found for the location you've entered.
Get my location
OR
OR
Rates for Alaska, Hawaii, and U.S. territories and possessions are set by the Department of Defense.
Traveler reimbursement is based on the location of the work activities and not the accommodations,
unless lodging is not available at the work activity, then the agency may authorize the rate where
lodging is obtained.
Unless otherwise specified, the per diem locality is defined as "all locations within, or entirely
surrounded by, the corporate limits of the key city, including independent entities located within
those boundaries."
Per diem localities with county definitions shall include"all locations within, or entirely
surrounded by, the corporate limits of the key city as well as the boundaries of the listed counties,
including independent entities located within the boundaries of the key city and the listed counties
(unless otherwise listed separately)."
When a military installation or Government - related facility(whether or not specifically named) is
located partially within more than one city or county boundary, the applicable per diem rate for the
entire installation or facility is the higher of the rates which apply to the cities and / or counties,
even though part(s) of such activities may be located outside the defined per diem locality.