This LPOE is within the Grand Portage Indian Reservation about five miles northeast of Grand Portage, Minnesota. The port serves passenger vehicles and pedestrians crossing between the United States and Neebing, Ontario, Canada. The route has allowed Native Americans, explorers, and voyagers to bypass high falls, cascades, and gorges for thousands of years.
On Nov. 19, 2024, GSA conducted the final National Environmental Policy Act (NEPA) public hearing. The review and comment period ended on Dec. 16, 2024.
Jan. 11, 2024: GSA met with the Grand Portage Band of Chippewa for a project review as part of their ongoing working relationship.
Jan. 5, 2024: GSA received the completely revised Program Development Study.
Dec. 14, 2023: Design review meeting.
Oct. 5, 2023: Public scoping meeting held.
Aug. 8, 2023: Construction Manager as Advisor contract award.
July 11, 2023: Memorandum of Understanding signed by Grand Portage Band of Lake Superior Chippewa to act as a cooperating agency.
June 14, 2023: Formal tribal consultation meeting with the Grand Portage Band of Lake Superior Chippewa, the Minnesota Department of Transportation, the U.S. Department of Housing and Urban Development, and Indian Health Service. 50% Program Development Study submission.
March 14, 2023: Formal tribal consultation meeting with the Grand Portage Band of Lake Superior Chippewa and the Minnesota Department of Transportation.
Nov. 4, 2022: 35% Program Development Study submission.
Sept. 13, 2022: First onsite tribal stakeholder meeting.
GSA received $3.4 billion to invest in our nation’s infrastructure and competitiveness. The law provides funding for LPOE modernization projects that will create new good-paying jobs, bolster safety and security, and make the economy more resilient to supply chain challenges — all while serving as models for sustainability and innovation.
Visit the Minnesota LPOE page for an overview of BIL projects there, as well as priorities, benefits and further information.
Sustainability opportunities
Since the extreme climate of northern Minnesota will have a direct effect on the energy use and materials at this facility, the project will use long-lasting materials, which are sustainable, climate resilient, low maintenance, functional, technologically efficient, and flexible. GSA will use high-performance green technology to reduce energy use 20%.
Passive energy-saving strategies may include:
Capturing internal heat gain.
Reducing heat loss with window glazing, thermochromic glass films, airtight assemblies, and above-code-minimum insulation.
Incorporating thermal bridging, passive solar heating, and daylight harvesting.
Active energy-saving strategies may include:
Geothermal heating and cooling.
Heat recovery systems.
Energy-efficiency building automation controls.
LED lighting.
Energy generation through photovoltaic and wind turbine systems.
Electric vehicle charging stations.
The facility will be designed to be net-zero carbon ready and achieve LEED Gold standards.
Community impact
The redesign and modernization of the port, which is second largest in Minnesota, will provide better support for its national security and international commerce functions. Additional lanes and a wider commercial truck lane will shorten vehicle processing times for tourists and residents accessing local community businesses, including Ryden’s Border Store, Grand Portage State Park, Grand Portage Lodge and Casino, Grand Portage National Monument Heritage Center, and the town of Grand Marais.
PER DIEM LOOK-UP
1
Choose a location
Error, The Per Diem API is not responding. Please try again later.
No results could be found for the location you've entered.
Get my location
OR
OR
Rates for Alaska, Hawaii, and U.S. territories and possessions are set by the Department of Defense.
Traveler reimbursement is based on the location of the work activities and not the accommodations,
unless lodging is not available at the work activity, then the agency may authorize the rate where
lodging is obtained.
Unless otherwise specified, the per diem locality is defined as "all locations within, or entirely
surrounded by, the corporate limits of the key city, including independent entities located within
those boundaries."
Per diem localities with county definitions shall include"all locations within, or entirely
surrounded by, the corporate limits of the key city as well as the boundaries of the listed counties,
including independent entities located within the boundaries of the key city and the listed counties
(unless otherwise listed separately)."
When a military installation or Government - related facility(whether or not specifically named) is
located partially within more than one city or county boundary, the applicable per diem rate for the
entire installation or facility is the higher of the rates which apply to the cities and / or counties,
even though part(s) of such activities may be located outside the defined per diem locality.